BIN YABER DRIVING INSTITUTE (G+1).

BIN YABER DRIVING INSTITUTE (G+1).

Project : BIN YABER DRIVING INSTITUTE (G+1). Location : Plot no. 5990109 /JABAL ALI INDUSTRIAL FIRST, DUBAI Client : Mr. MOHAMED GABER ABDULLA MOHAMED AL HARBI. Consultant : M/s DAR AL OMRAN Consultants Contractor : M/s AL MEMZAR CONTRACTING.

Recommended for you

(B+G+P+9+ROOF) RESIDENTIAL BUILDING.

(B+G+P+9+ROOF) RESIDENTIAL BUILDING.

To : M/s GULF ASIA CONTRACTING CO.LL...

RESIDENTIAL WITH RETAIL BUILDING (GROUND+PODIUM+7 FLOORS + ROOF)

RESIDENTIAL WITH RETAIL BUILDING (GROUND+PODIUM+7 FLOORS + ROOF)

CONTRACTOR : M/s LUXEDESIGN BUILDING CONTRACTIN...

G+2P+6 COMMERCIAL & RESIDENTIAL BUILDING

G+2P+6 COMMERCIAL & RESIDENTIAL BUILDING

To : M/s AL MASAOOD NATIONAL GENERAL...